- Contact Person : Mr. TENG KEN
- Company Name : CHTC JOVE Heavy Industry Co., Ltd.
- Tel : 86-731-82398696
- Fax : 86-731-82398697
- Address : Hunan,Changsha,No.3, Dongliu Rd. Changsha Economic Development Zone, Hunan, China
- Country/Region : China
JVHZ 62 Embankment piling machine
Many embankment projects always meet the difficulty about soft embankment. The precast pile is with high strength, standardized production, reliable quality and good piling quality.In the soft embankment project, using precast pile to do the anti-slide pile, the advantage is obvious. Because the embankment surface is not level, the precast piling machine is big, heavy and need a wide working area; it is difficult to work on the embankment, thus limited the application of precast pile in embankment foundation project. Embankment piling machine overcomes all the defects above which exists in traditional machines. It can use the piles which hammered by itself as a supporting point, and put steel board onto the piles as a machine working platform, to solve the problems of construction on the embankment.
1 – Counter Weight 2- Sliding shift mechanism 3- Lifting mechanism 4- Engine 5 - longitude shift mechanism 6- auxiliary supporting leg 7 - crane 8 – operation platform 9- supporting pole 10 - mast 11 - The main winch 12 - auxiliary winch 13 - diesel hammer
The basic structures of VHZ62 Embankment piling machineUndercarriageWalking Undercarriage (including a Sliding shift mechanism, a longitude shift mechanism), consistent with the features working on the embankment. The arc in the middle of the sliding shift mechanism ensures enough grounding.MastConvenient lifting with cylinder; Stable and reliable triangle supporting structure.
Main machine bodyThe long machine body, which could be rotated, can work on 3 different pile positions with no machine shift. It greatly ensures the safety and convenience.
MAIN FEATURES:1, original patent: Patent No. 201120341460.2 201110269494.X;2, Applicable for slope, water, marsh, silt, unsmooth of complex geography conditions.3, adopts the barrel type diesel hammer or hydraulic hammer, with strong power;4, fully hydraulic drive, flexible movement, convenient operation;5, engine, hydraulic parts and other key parts adopt world-famous brands with high configuration, long life and reliable quality;
Item | Parameters | |||
Dimensions(mm)(work length × work width × transport height) | 13500×5500×4300 | |||
(DF62)diesel hammer | Piston weight | 6.2T | ||
Maximum fuel consumption | diesel:19.1L/h; lubricants:3L/h | |||
Diesel hammer (pile caps excluded) Total weight | 13T | |||
Mast | the total height | 20m | ||
The max. single pile length | 10m | |||
Diesel engine | power | 60KW | ||
60KW/2200rpm(2000rpm) | ||||
Fuel tank volume | 165L | |||
Walking speed | forward shift | ≤3.98 m/min | ||
Back shift | ≤2.35m/min | |||
Left shift | ≤4.7m/min | |||
Right shift | ≤7.95 m/min | |||
Turning angle | -20°~20° | |||
Leg lift stroke | 0.9 m | |||
Main winch | single rope pull | 5.5T | ||
The main winch lifting speed (hanging diesel hammer) | 6.8m/min | |||
auxiliary winch | single rope pull | 3T | ||
auxiliary winch lifting speed (2 rate) | 12m/min | |||
Hydraulic system | system rated pressure | 19MPa | ||
auxiliary winch rated pressure | 13Mpa | |||
the flow of the main winch(full flow) | 128L/min(PS: the value of the full-flow engine speed tune 2000rpm) | |||
auxiliary winch flow (full flow) | 64L/min(PS: the value of the full-flow engine speed tune 2000rpm) | |||
Hydraulic pump | work Oil Pump (Double pump) | Model | K3SP36C | |
Displacement Displacement | 32×2ml/r | |||
Maximum pressure | 28Mpa | |||
Pilot pump | Model | CBT-F410-Alφ | ||
Displacement | 9.4ml/r | |||
set pressure | 3.4Mpa | |||
Total Weight | 100T |
JVHZ 62 Embankment piling machine