- Contact Person : Mr. TENG KEN
- Company Name : CHTC JOVE Heavy Industry Co., Ltd.
- Tel : 86-731-82398696
- Fax : 86-731-82398697
- Address : Hunan,Changsha,No.3, Dongliu Rd. Changsha Economic Development Zone, Hunan, China
- Country/Region : China
JZB90 Long Auger Drilling Rig
Long Auger Drilling Rig:
Long Auger drilling rig is a new product which developed based on domestic and international advanced technology. It is a foundation and basic processing equipment, applied for CFG, precast pile, cast-in-place pile, and diaphragm wall, soft base enhance, etc, especially for piling foundation in housing construction. Currently CFG pile foundation and grouting ultra-fluidized construction technique which has been widely applied to civil construction, traffic, and energy and so on, and it is developed as a kind of composite foundation treatment of new technology in recent years and also listed as national new method and national construction standard.
Technical Parameters of JZB90:
Max. drilling diameter | 800mm | Main hoister | Type | JK8 | |
Max. drilling depth | 31m | Load of single line | 80KN | ||
Power head | Type | ZZSH480-60 | Rope speed | 22.5m/min | |
Power | 2*55kw | Max. pull force | 640KN | ||
Output speed | 16 r/min | ||||
Max. output torque | 55KN.m | Assistant hoister | Type | JK2.5 | |
Pile frame | Type | Walking type three-point support | Load of single line | 25KN | |
Walking speed | 0.08m/s | ||||
Rotation angle | Full slewing | Rope speed | 18m/min | ||
Slewing speed | 0.31 r/min | Oil pump | Type | CBF-E63 | |
Ground pressure | 0.062 MPa | System pressure | 16MPa | ||
Overall dimension | (12.5*6.0*38.2)m | Total weight | 55T |
Main features:
1.It can finish the pile in one time, perfuse pile at site and also finish the operation of placing the steel cage. Efficient, high quality and low cost are the main advantages of this machine.
2.Simple structure ensures flexible move, easy operation and convenience maintenance.
3.It is applicable for clay soil, silt and fill, etc. It can piling in different complicated geological conditions such as soft soil, draft sand formation, sand and gravel layers, with groundwater and so on. Besides, it can construct cast-in-place pile, hi-pressure grouting-pile, grouting ultra-fluidized pile, CFG composite pile, pedestal pile and other ways.
4.There are no vibration, noise and pollution during construction. It’s an excellent equipment for infrastructure construction
Main Accessory:
1.Drill Pipe
Drill Bits
The machine uses spiral drill pipe,jointed by flange. The bottom of the drill pipe has a valve,preventing the clay from entering the center pipe.When pressing concrete or clay, the valve can open automatically.
2.Power Head
The head is composed of decelerator,two air-cooled motors,bend head,hoisting frame and slider.When in operation,two motors drive the decelerator's high speed axis rotating through coupling,whose power is transferred to lower speed axis, and then the lower speed axis drive the drill pipe rotating through flange. The top side of lower speed axis has sealed accessory and connecting with bend pipe.
3. Swing mechanism
The swing unit can make the pile frame turning 360 degree, and the huge frame decelerator can easily avoid the unnecessary damage.
JZB90 Long Auger Drilling Rig